Dallas, Texas
Dallas, Texas
New York City, USA
San Francisco, California, USA
Washington DC, USA
Seattle, WA, USA
EVMi® Earned Value Management Institute®, 8700 Stonebrook Pkwy, Number 1624, Frisco, Texas 75034 USA
info@evmi.com
+1.469.920.4066 (USA)
info@evmi.com
+1.469.920.4066 (USA) / 1.855.400.3864 (Toll free)
info@evmi.com
+1.469.920.4066 (USA) / 1.855.400.3864 (Toll free)
info@evmi.com
+1.469.920.4066 (USA) / 1.855.400.3864 (Toll free)
info@evmi.com
+1.469.920.4066 (USA) / 1.855.400.3864 (Toll free)
Home
AI Certs
CEVOAI™ Chief Earned Value Officer Artificial Intelligence™
PMAI™ Project Management Artificial Intelligence™
EVMPAI™ Earned Value Management Professional – Artificial Intelligence™
EVMI-AIPP™ EVMI Artificial Intelligence Project Professional™
EVMI-AIPM™ EVMI Artificial Intelligence Project Manager™
EVMI-AIPD™ EVMI Artificial Intelligence Project Director™
EVMI-AIPO™ EVMI Artificial Intelligence Project Officer™
EVMI-AIExec™ EVMI Artificial Intelligence Executive™
RQMPAI™ Risk & Quality Management Professional Artificial Intelligence™
CCAMAI™ Certified Control Account Manager Artificial Intelligence™
CPCPAI™ Certified Project Control Professional Artificial Intelligence™
Project Cntrl Certs
Project Control – Advanced
CPCM™ Certified Project Control Manager™ | $7,499 | 3 Days
CPCD™ Certified Project Control Director™ | $9,999 | 2 Days
CPCO™ Certified Project Control Officer™ | $9,999 | 3 Days
Project Control – Professional
CPCW™ Certified Project Control Worker™ | $3,499 | 3 Days
CPCA™ Certified Project Control Associate™ | $3,999 | 3 Days
CPCP™ Certified Project Control Professional™ | $4,999 | 5 Days
Project Control – Expert
RQMP® Risk & Quality Management Professional® Certification | $4,999 | 3 Days
SPMP™ Schedule & Planning Management Professional™ | $4,999 | 3 Days
CCMP™ Change Control & Management Professional™ Certification | $4,999 | 3 Days
RRMP™ Risk & Resiliency Management Professional™ Certification | $4,999 | 3 Days
Project Control – Executive
CRQO™ Chief Risk & Quality Officer™ Certification | $19,999 | 3 Days
ChSPO™ Chief Schedule & Planning Officer™ Certification | $19,999 | 3 Days
ChPCO™ Chief Project Control Officer™ Certification | $19,999 | 3 Days
CRRO™ Chief Risk & Resiliency Officer™ Certification | $19,999 | 3 Days
CCMO™ Change Control & Management Officer™ Certification | $19,999 | 3 Days
EVM Certs
EVMP® Earned Value Management Professional® Certification – The King & Queen Of EVM & Project Control™ | $4999 per participant | 5 Days | 25 Participants or more per client
EVMO™ Earned Value Management Officer™ Certification | $14,999 Per Participant | 2 Days | 25 Participants or more per client
EVMD™ Earned Value Management Director™ Certification | $14,999 Per Participant | 3 Days | 25 Participants or more per client
EVMA™ Earned Value Management Associate™ Certification | $3,999 per participant | 3 Days | 220 participants or more required per client
EVMVAP™ Earned Value Management Variance Analysis Professional™ Certification | $999 per participant | 2 Days | 1,000 participants or more required per client
EVMCAP™ Earned Value Management Corrective Actions Professional™ Certification | $999 per participant | 2 Days | 1,000 participants or more required per client
EVMW™ Earned Value Management Worker™ Certification | $999 per participant | 2 Days | 1,000 participants or more required per client
EVME™ Earned Value Management Expert™ Certification | $14,999 | 3 Days | 25 Participants or more per client
EVMPM™ Earned Value Management Project Manager™ Certification | $14,999 | 3 Days | 20 Participants or more per client
EVMFFP™ Earned Value Management Forensics & Fraud Professional™ Certification | $14,999 | 3 Days | 20 Participants or more per client
Triple Threat Certified: EVMP®, EVMD™, EVMO™ Certification | $34,997 | 25 Participants or more per client
CAEVM™ Certified Architect in Earned Value Management™ Certification | $14,999 | 3 Days | 20 Participants or more per client
EVMP-Industry Certs
EVMP – Industry™ Certifications
EVMPAI™ Earned Value Management Professional – Artificial Intelligence™
EVMP – Automotive™
EVMP – Apparel™
EVMP – Aerospace & Defense™
EVMP – Banking & Financial Services™
EVMP – Agile™
EVMP – Agriculture™
EVMP – Beverages & Alcohol™
EVMP – Airlines & Aviation™
EVMP – Bio-Technology™
EVMP – Industry™ Certifications
EVMP –Business Services™
EVMP – Climate Change™
EVMP – Computer Hardware & Software™
EVMP – Consumer Packaged Goods™
EVMP – Diversified™
EVMP – Education Management™
EVMP – Electronics™
EVMP – Environment™
EVMP – Industry™ Certifications
EVMP – Farm Machinery™
EVMP – Film, Motion Picture, Entertainment™
EVMP – Food Products™
EVMP – Forestry™
EVMP – General Merchandising™
EVMP – Government™
EVMP – Healthcare™
EVMP – Heavy Construction™
EVMP – Hospitality & Tourism™
EVMP – Industry™ Certifications
EVMP – Housing & Real Estate™
EVMP – Heavy & Industrial Machinery™
EVMP – Infrastructure™
EVMP – Luxury™
EVMP – Manufacturing™
EVMP – Management Consulting™
EVMP – Materials™
EVMP – Medical Products™
EVMP – Industry™ Certifications
EVMP – Energy & Nuclear Power™
EVMP – Metals™
EVMP – Mining & Drilling™
EVMP – Oil & Gas™
EVMP – Pharmaceuticals™
EVMP – Pipelines™
EVMP – Printing & Publishing™
EVMP – Retail™
EVMP – Renewable Energy & Solar Technology™
EVMP – Industry™ Certifications
EVMP – Science & Life Sciences™
EVMP – Shipbuilding™
EVMP – Space Systems & Space Technology™
EVMP – Sports & Sporting Goods™
EVMP – Technology™
EVMP – Telecom & Media™
EVMP – Transportation, Freight, Logistics™
EVMP – Utilities™
Control Account Certs
CCAA™ Certified Control Account Associate™ Certification | $2,999 per participant | 5 Days | 25 Participants or more per client
CCAP™ Certified Control Account Professional™ Certification | $3,999 per participant | 5 Days | 25 Participants or more per client
CCAM® Certified Control Account Manager® Certification | $4,999 per participant | 3 Days | 25 Participants or more per client
CCAD™ Certified Control Account Director™ Certification | $9,999 per participant | 5 Days | 25 Participants or more per client
CCAO™ Certified Control Account Officer™ Certification | $14,999 per participant | 5 Days | 25 Participants or more per client
ChiefCAO™ Chief Control Account Officer™ Certification | $24,999 per participant | 5 Days | 25 Participants or more per client
ExecEd
EVMCEO™ Earned Value Management Chief Executive Officer™ | $149,999 | 5 Days
CEVO® Chief Earned Value Officer® Certification | $24,999 | 3 Days
ChiefAEVM™ Chief Architect in Earned Value Management™ Certification | $24,999 | 3 Days
ProjectM™
ProjectM™ – Americas | Asia | OC
ProjectM™ (North America)
USAProjectM™ United States of America Project Manager™
CanadaProjectM™ Canada Project Manager™
MexicoProjectM™ Mexico Project Manager™
ProjectM™ (South America)
BrazilProjectM™ Brazil Project Manager™
ColombiaProjectM™ Colombia Project Manager™
ArgentinaProjectM™ Argentina Project Manager™
ChileProjectM™ Chile Project Manager™
ProjectM™ (Asia)
ChinaProjectM™ China Project Manager™
JapanProjectM™ Japan Project Manager™
IndiaProjectM™ India Project Manager™
SouthKoreaProjectM™ South Korea Project Manager™
ProjectM™ (Asia)
SingaporeProjectM™ Singapore Project Manager™
IndonesiaProjectM™ Indonesia Project Manager™
PhilippinesProjectM™ Philippines Project Manager™
HongKongProjectM™ Hong Kong Project Manager™
KazakhstanProjectM™ Kazakhstan Project Manager™
UzbekistanProjectM™ Uzbekistan Project Manager™
ProjectM™ (Asia)
TaiwanPM™ Taiwan Project Manager™
ThailandProjectM™ Thailand Project Manager™
VietNamProjectM™ VietNam Project Manager™
MalaysiaProjectM™ Malaysia Project Manager™
BangladeshProjectM™ Bangladesh Project Manager™
AzerbaijanProjectM™ Azerbaijan Project Manager™
ProjectM™ Oceania
AustraliaProjectM™ Australia Project Manager™
NewZealandProjectM™ New Zealand Project Manager™
ProjectM™ – EMEA
ProjectM™ (Europe)
UkraineProjectM™ Ukraine Project Manager™
GermanyProjectM™ Germany Project Manager™
FranceProjectM™ France Project Manager™
ItalyProjectM™ Italy Project Manager™
SpainProjectM™ Spain Project Manager™
UKProjectM™ United Kingdom Project Manager™
PortugalProjectM™ Portugal Project Manager™
HungaryProjectM™ Hungary Project Manager™
ProjectM™ (Europe)
PolandProjectM™ Poland Project Manager™
BelgiumProjectM™ Belgium Project Manager™
IrelandProjectM™ Ireland Project Manager™
AustriaProjectM™ Austria Project Manager™
SlovakiaProjectM™ Slovakia Project Manager™
NetherlandsProjectM™ Netherlands Project Manager™
TurkeyProjectM™ Turkey Project Manager™
RussiaProjectM™ Russia Project Manager™
ProjectM™ (Europe)
GreeceProjectM™ Greece Project Manager™
CzechProjectM™ Czech Project Manager™
RomaniaProjectM™ Romania Project Manager™
SwedenProjectM™ Sweden Project Manager™
DenmarkProjectM™ Denmark Project Manager™
FinlandProjectM™ Finland Project Manager™
NorwayProjectM™ Norway Project Manager™
SwitzerlandProjectM™ Switzerland Project Manager™
ProjectM™ (Middle East)
IsraelProjectM™ Israel Project Manager™
SaudiArabiaProjectM™ Saudi Arabia Project Manager™
QatarProjectM™ Qatar Project Manager™
OmanProjectM™ Oman Project Manager™
UAEProjectM™ United Arab Emirates Project Manager™
KuwaitProjectM™ Kuwait Project Manager™
ProjectM™ (Africa)
GhanaProjectM™ Ghana Project Manager™
NigeriaProjectM™ Nigeria Project Manager™
SouthAfricaProjectM™ South Africa Project Manager™
EgyptProjectM™ Egypt Project Manager™
AlgeriaProjectM™ Algeria Project Manager™
KenyaProjectM™ Kenya Project Manager™
BotswanaProjectM™ Botswana Project Manager™
MoroccoProjectM™ Morocco Project Manager™
TunisiaProjectM™ Tunisia Project Manager™
ProjectM™ (Africa)
TanzaniaProjectM™ Tanzania Project Manager™
CameroonProjectM™ Cameroon Project Manager™
AngolaProjectM™ Angola Project Manager™
SenegalProjectM™ Senegal Project Manager™
EthiopiaProjectM™ Ethiopia Project Manager™
DRCProjectM™ Democratic Republic of Congo Project Manager™
RwandaProjectM™ Rwanda Project Manager™
ZambiaProjectM™ Zambia Project Manager™
IvoryCoastProjectM™ Ivory Coast Project Manager™
Courses
EIA 748 EVMS Compliance Certification Course | 3 Days | $4,999 per participant
EVMI-PP™ Earned Value Management Institute – Product Professional™
MaestroPM™ Maestro Project Manager™ – Most Advanced Project Management Certification | $24,999 per Participant
EVMI-PM™ Earned Value Management Institute – Project Manager™
Earned Value Management (EVM) Fundamentals | 3 Days | $2,499 per participant
Project Management Fundamentals | 3 Days | $2,499 per participant
AEVMS™ Advanced Earned Value Management Systems™: $7,499
APPM™ Advanced Program & Project Management™: $7,499
EVMYouth™ Earned Value Management Youth™ Certification
PMYouth™ Project Management Youth™ Certification
Calendar
Services
Testimonials
University
MSEVM® Master of Science in Earned Value Management®
EVMu® Earned Value Management University® – Leader in EVM Education
Pple
Professor Kwaku Akyeampong, MS (Economics), MS (Information Systems Technology), MS (Project Management), PhD Cand., EVMP™, EVMO™, ChPCO™
Ms. Jane Udoewa, MS (Computer Science), BS (Computer Science), EVMO™, EVMP®
Lt. Col (ret) David Reth, MS (Management), BS (Aeronautical Engineering), EVMP®, EVMP – Aerospace & Defense™
Dr. Kara Lynn Lewis, PhD, MBA, MS, BS, EVMP®, EVMP – Government™, EVMD™, EVMO™ , CRQO™ , ChPCO™, ChPRO™
Ms. Holly Beckstrom, BS (Information Systems), Master of Education (Instructional Technology), EVMP®, EVMD, EVMO®, CRQO™, ChPRO™
Mrs. Chiquita Hutton, MBA, BS (Business and Management), EVMP®, EVMP – Government™, EVMD, EVMO™ , CRQO™, ChPRO™
Mrs. Linda Roy, BS (Health Administration), EVMP®, EVMP – Energy & Nuclear Power™, EVMD™, EVMO™
Mrs. Cheryl Parker, BS (Finance and Accounting), EVMP®, EVMP – Aerospace & Defense™, EVMD™, EVMO™
Mr. Jose Alberto Sosa, BS (Electrical Engineering), MS (Electrical Engineering), MS (Finance), EVMP®, EVMP – Oil & Gas™, EVMD™, EVMO™
Mr. Scott Boise, Master of Business Administration (M.B.A.) Finance, BBA, EVMP, SSBB
Mr. Oludayo Kehinde, Bachelor of Science, PMP, EVMP, ChPCO
Mrs. Gwenna Hill, BA (English), MS (Computer Information Systems), PMP®, EVMP®, EVMD™, EVMO™
Mr. Ingram Liljestrand, MBA, BS (Industrial Engineering), EVMP®, EVMP – IT™, CRQO™ , ChPCO™, ChPRO™
CoE
PMCoE-O™ Project Management Center of Excellence Officer™
Buy
More
WHO WE ARE
EVMI Registered Educational Marks, Service marks and Trademarks
Make Payment Using ZELLE
Contact Us
Our Services
About Us
Why Choose Us
Alumni – Featured
Our History
Company overview
Our approach
Our Policies
Our Partners & Clients
Our Webinars
WHAT WE DO
EVMi® Earned Value Management (EVM) Education
About CEO
Featured Instructor
Featured Expert Profile:
Our Industries We Serve
EVMBOK
Our Core Values
Participating Aerospace & Defense Companies
DISCOVER
PDUs
Approach
EVMI FAQs
Shop
Cart
My account
News
News Feed
INFORMATION
WorldEVMDay®
EVMi® Leadership Academy
FederalevmMonth
TOP 10
Our Blog
Solutions
Job openings
EVMpedia
Resources
EXPERIENCE
Our Services
Health Crisis PM™
US Federal Government Approved
Notice About Changes on EVMP Certification on 1 January 2020*
Best Earned Value Management Systems (EVMS) Software – 2022
Affiliated Organizations
C-Suite Institute ((Executive & C-Suite Education Global Leader))
Defense Acquisition University (DAU)
Project Management Institute (PMI)
Northwind Group resiliently complete their EVMP certifications during COVID-19 Pandemic
Featured Alumni
Resiliency
*EVMI COVID-19 Guidelines and Announcements
RRRP Risk, Resilience & Recovery Professional™ (COVID19)
HealthCrisisPPM™ Health Crisis & Pandemic Project Manager™ (COVID19)
CRRRO Chief Risk, Resilience & Recovery Officer™ (COVID19)
Alum
Home
AI Certs
CEVOAI™ Chief Earned Value Officer Artificial Intelligence™
PMAI™ Project Management Artificial Intelligence™
EVMPAI™ Earned Value Management Professional – Artificial Intelligence™
EVMI-AIPP™ EVMI Artificial Intelligence Project Professional™
EVMI-AIPM™ EVMI Artificial Intelligence Project Manager™
EVMI-AIPD™ EVMI Artificial Intelligence Project Director™
EVMI-AIPO™ EVMI Artificial Intelligence Project Officer™
EVMI-AIExec™ EVMI Artificial Intelligence Executive™
RQMPAI™ Risk & Quality Management Professional Artificial Intelligence™
CCAMAI™ Certified Control Account Manager Artificial Intelligence™
CPCPAI™ Certified Project Control Professional Artificial Intelligence™
Project Cntrl Certs
Project Control – Advanced
CPCM™ Certified Project Control Manager™ | $7,499 | 3 Days
CPCD™ Certified Project Control Director™ | $9,999 | 2 Days
CPCO™ Certified Project Control Officer™ | $9,999 | 3 Days
Project Control – Professional
CPCW™ Certified Project Control Worker™ | $3,499 | 3 Days
CPCA™ Certified Project Control Associate™ | $3,999 | 3 Days
CPCP™ Certified Project Control Professional™ | $4,999 | 5 Days
Project Control – Expert
RQMP® Risk & Quality Management Professional® Certification | $4,999 | 3 Days
SPMP™ Schedule & Planning Management Professional™ | $4,999 | 3 Days
CCMP™ Change Control & Management Professional™ Certification | $4,999 | 3 Days
RRMP™ Risk & Resiliency Management Professional™ Certification | $4,999 | 3 Days
Project Control – Executive
CRQO™ Chief Risk & Quality Officer™ Certification | $19,999 | 3 Days
ChSPO™ Chief Schedule & Planning Officer™ Certification | $19,999 | 3 Days
ChPCO™ Chief Project Control Officer™ Certification | $19,999 | 3 Days
CRRO™ Chief Risk & Resiliency Officer™ Certification | $19,999 | 3 Days
CCMO™ Change Control & Management Officer™ Certification | $19,999 | 3 Days
EVM Certs
EVMP® Earned Value Management Professional® Certification – The King & Queen Of EVM & Project Control™ | $4999 per participant | 5 Days | 25 Participants or more per client
EVMO™ Earned Value Management Officer™ Certification | $14,999 Per Participant | 2 Days | 25 Participants or more per client
EVMD™ Earned Value Management Director™ Certification | $14,999 Per Participant | 3 Days | 25 Participants or more per client
EVMA™ Earned Value Management Associate™ Certification | $3,999 per participant | 3 Days | 220 participants or more required per client
EVMVAP™ Earned Value Management Variance Analysis Professional™ Certification | $999 per participant | 2 Days | 1,000 participants or more required per client
EVMCAP™ Earned Value Management Corrective Actions Professional™ Certification | $999 per participant | 2 Days | 1,000 participants or more required per client
EVMW™ Earned Value Management Worker™ Certification | $999 per participant | 2 Days | 1,000 participants or more required per client
EVME™ Earned Value Management Expert™ Certification | $14,999 | 3 Days | 25 Participants or more per client
EVMPM™ Earned Value Management Project Manager™ Certification | $14,999 | 3 Days | 20 Participants or more per client
EVMFFP™ Earned Value Management Forensics & Fraud Professional™ Certification | $14,999 | 3 Days | 20 Participants or more per client
Triple Threat Certified: EVMP®, EVMD™, EVMO™ Certification | $34,997 | 25 Participants or more per client
CAEVM™ Certified Architect in Earned Value Management™ Certification | $14,999 | 3 Days | 20 Participants or more per client
EVMP-Industry Certs
EVMP – Industry™ Certifications
EVMPAI™ Earned Value Management Professional – Artificial Intelligence™
EVMP – Automotive™
EVMP – Apparel™
EVMP – Aerospace & Defense™
EVMP – Banking & Financial Services™
EVMP – Agile™
EVMP – Agriculture™
EVMP – Beverages & Alcohol™
EVMP – Airlines & Aviation™
EVMP – Bio-Technology™
EVMP – Industry™ Certifications
EVMP –Business Services™
EVMP – Climate Change™
EVMP – Computer Hardware & Software™
EVMP – Consumer Packaged Goods™
EVMP – Diversified™
EVMP – Education Management™
EVMP – Electronics™
EVMP – Environment™
EVMP – Industry™ Certifications
EVMP – Farm Machinery™
EVMP – Film, Motion Picture, Entertainment™
EVMP – Food Products™
EVMP – Forestry™
EVMP – General Merchandising™
EVMP – Government™
EVMP – Healthcare™
EVMP – Heavy Construction™
EVMP – Hospitality & Tourism™
EVMP – Industry™ Certifications
EVMP – Housing & Real Estate™
EVMP – Heavy & Industrial Machinery™
EVMP – Infrastructure™
EVMP – Luxury™
EVMP – Manufacturing™
EVMP – Management Consulting™
EVMP – Materials™
EVMP – Medical Products™
EVMP – Industry™ Certifications
EVMP – Energy & Nuclear Power™
EVMP – Metals™
EVMP – Mining & Drilling™
EVMP – Oil & Gas™
EVMP – Pharmaceuticals™
EVMP – Pipelines™
EVMP – Printing & Publishing™
EVMP – Retail™
EVMP – Renewable Energy & Solar Technology™
EVMP – Industry™ Certifications
EVMP – Science & Life Sciences™
EVMP – Shipbuilding™
EVMP – Space Systems & Space Technology™
EVMP – Sports & Sporting Goods™
EVMP – Technology™
EVMP – Telecom & Media™
EVMP – Transportation, Freight, Logistics™
EVMP – Utilities™
Control Account Certs
CCAA™ Certified Control Account Associate™ Certification | $2,999 per participant | 5 Days | 25 Participants or more per client
CCAP™ Certified Control Account Professional™ Certification | $3,999 per participant | 5 Days | 25 Participants or more per client
CCAM® Certified Control Account Manager® Certification | $4,999 per participant | 3 Days | 25 Participants or more per client
CCAD™ Certified Control Account Director™ Certification | $9,999 per participant | 5 Days | 25 Participants or more per client
CCAO™ Certified Control Account Officer™ Certification | $14,999 per participant | 5 Days | 25 Participants or more per client
ChiefCAO™ Chief Control Account Officer™ Certification | $24,999 per participant | 5 Days | 25 Participants or more per client
ExecEd
EVMCEO™ Earned Value Management Chief Executive Officer™ | $149,999 | 5 Days
CEVO® Chief Earned Value Officer® Certification | $24,999 | 3 Days
ChiefAEVM™ Chief Architect in Earned Value Management™ Certification | $24,999 | 3 Days
ProjectM™
ProjectM™ – Americas | Asia | OC
ProjectM™ (North America)
USAProjectM™ United States of America Project Manager™
CanadaProjectM™ Canada Project Manager™
MexicoProjectM™ Mexico Project Manager™
ProjectM™ (South America)
BrazilProjectM™ Brazil Project Manager™
ColombiaProjectM™ Colombia Project Manager™
ArgentinaProjectM™ Argentina Project Manager™
ChileProjectM™ Chile Project Manager™
ProjectM™ (Asia)
ChinaProjectM™ China Project Manager™
JapanProjectM™ Japan Project Manager™
IndiaProjectM™ India Project Manager™
SouthKoreaProjectM™ South Korea Project Manager™
ProjectM™ (Asia)
SingaporeProjectM™ Singapore Project Manager™
IndonesiaProjectM™ Indonesia Project Manager™
PhilippinesProjectM™ Philippines Project Manager™
HongKongProjectM™ Hong Kong Project Manager™
KazakhstanProjectM™ Kazakhstan Project Manager™
UzbekistanProjectM™ Uzbekistan Project Manager™
ProjectM™ (Asia)
TaiwanPM™ Taiwan Project Manager™
ThailandProjectM™ Thailand Project Manager™
VietNamProjectM™ VietNam Project Manager™
MalaysiaProjectM™ Malaysia Project Manager™
BangladeshProjectM™ Bangladesh Project Manager™
AzerbaijanProjectM™ Azerbaijan Project Manager™
ProjectM™ Oceania
AustraliaProjectM™ Australia Project Manager™
NewZealandProjectM™ New Zealand Project Manager™
ProjectM™ – EMEA
ProjectM™ (Europe)
UkraineProjectM™ Ukraine Project Manager™
GermanyProjectM™ Germany Project Manager™
FranceProjectM™ France Project Manager™
ItalyProjectM™ Italy Project Manager™
SpainProjectM™ Spain Project Manager™
UKProjectM™ United Kingdom Project Manager™
PortugalProjectM™ Portugal Project Manager™
HungaryProjectM™ Hungary Project Manager™
ProjectM™ (Europe)
PolandProjectM™ Poland Project Manager™
BelgiumProjectM™ Belgium Project Manager™
IrelandProjectM™ Ireland Project Manager™
AustriaProjectM™ Austria Project Manager™
SlovakiaProjectM™ Slovakia Project Manager™
NetherlandsProjectM™ Netherlands Project Manager™
TurkeyProjectM™ Turkey Project Manager™
RussiaProjectM™ Russia Project Manager™
ProjectM™ (Europe)
GreeceProjectM™ Greece Project Manager™
CzechProjectM™ Czech Project Manager™
RomaniaProjectM™ Romania Project Manager™
SwedenProjectM™ Sweden Project Manager™
DenmarkProjectM™ Denmark Project Manager™
FinlandProjectM™ Finland Project Manager™
NorwayProjectM™ Norway Project Manager™
SwitzerlandProjectM™ Switzerland Project Manager™
ProjectM™ (Middle East)
IsraelProjectM™ Israel Project Manager™
SaudiArabiaProjectM™ Saudi Arabia Project Manager™
QatarProjectM™ Qatar Project Manager™
OmanProjectM™ Oman Project Manager™
UAEProjectM™ United Arab Emirates Project Manager™
KuwaitProjectM™ Kuwait Project Manager™
ProjectM™ (Africa)
GhanaProjectM™ Ghana Project Manager™
NigeriaProjectM™ Nigeria Project Manager™
SouthAfricaProjectM™ South Africa Project Manager™
EgyptProjectM™ Egypt Project Manager™
AlgeriaProjectM™ Algeria Project Manager™
KenyaProjectM™ Kenya Project Manager™
BotswanaProjectM™ Botswana Project Manager™
MoroccoProjectM™ Morocco Project Manager™
TunisiaProjectM™ Tunisia Project Manager™
ProjectM™ (Africa)
TanzaniaProjectM™ Tanzania Project Manager™
CameroonProjectM™ Cameroon Project Manager™
AngolaProjectM™ Angola Project Manager™
SenegalProjectM™ Senegal Project Manager™
EthiopiaProjectM™ Ethiopia Project Manager™
DRCProjectM™ Democratic Republic of Congo Project Manager™
RwandaProjectM™ Rwanda Project Manager™
ZambiaProjectM™ Zambia Project Manager™
IvoryCoastProjectM™ Ivory Coast Project Manager™
Courses
EIA 748 EVMS Compliance Certification Course | 3 Days | $4,999 per participant
EVMI-PP™ Earned Value Management Institute – Product Professional™
MaestroPM™ Maestro Project Manager™ – Most Advanced Project Management Certification | $24,999 per Participant
EVMI-PM™ Earned Value Management Institute – Project Manager™
Earned Value Management (EVM) Fundamentals | 3 Days | $2,499 per participant
Project Management Fundamentals | 3 Days | $2,499 per participant
AEVMS™ Advanced Earned Value Management Systems™: $7,499
APPM™ Advanced Program & Project Management™: $7,499
EVMYouth™ Earned Value Management Youth™ Certification
PMYouth™ Project Management Youth™ Certification
Calendar
Services
Testimonials
University
MSEVM® Master of Science in Earned Value Management®
EVMu® Earned Value Management University® – Leader in EVM Education
Pple
Professor Kwaku Akyeampong, MS (Economics), MS (Information Systems Technology), MS (Project Management), PhD Cand., EVMP™, EVMO™, ChPCO™
Ms. Jane Udoewa, MS (Computer Science), BS (Computer Science), EVMO™, EVMP®
Lt. Col (ret) David Reth, MS (Management), BS (Aeronautical Engineering), EVMP®, EVMP – Aerospace & Defense™
Dr. Kara Lynn Lewis, PhD, MBA, MS, BS, EVMP®, EVMP – Government™, EVMD™, EVMO™ , CRQO™ , ChPCO™, ChPRO™
Ms. Holly Beckstrom, BS (Information Systems), Master of Education (Instructional Technology), EVMP®, EVMD, EVMO®, CRQO™, ChPRO™
Mrs. Chiquita Hutton, MBA, BS (Business and Management), EVMP®, EVMP – Government™, EVMD, EVMO™ , CRQO™, ChPRO™
Mrs. Linda Roy, BS (Health Administration), EVMP®, EVMP – Energy & Nuclear Power™, EVMD™, EVMO™
Mrs. Cheryl Parker, BS (Finance and Accounting), EVMP®, EVMP – Aerospace & Defense™, EVMD™, EVMO™
Mr. Jose Alberto Sosa, BS (Electrical Engineering), MS (Electrical Engineering), MS (Finance), EVMP®, EVMP – Oil & Gas™, EVMD™, EVMO™
Mr. Scott Boise, Master of Business Administration (M.B.A.) Finance, BBA, EVMP, SSBB
Mr. Oludayo Kehinde, Bachelor of Science, PMP, EVMP, ChPCO
Mrs. Gwenna Hill, BA (English), MS (Computer Information Systems), PMP®, EVMP®, EVMD™, EVMO™
Mr. Ingram Liljestrand, MBA, BS (Industrial Engineering), EVMP®, EVMP – IT™, CRQO™ , ChPCO™, ChPRO™
CoE
PMCoE-O™ Project Management Center of Excellence Officer™
Buy
More
WHO WE ARE
EVMI Registered Educational Marks, Service marks and Trademarks
Make Payment Using ZELLE
Contact Us
Our Services
About Us
Why Choose Us
Alumni – Featured
Our History
Company overview
Our approach
Our Policies
Our Partners & Clients
Our Webinars
WHAT WE DO
EVMi® Earned Value Management (EVM) Education
About CEO
Featured Instructor
Featured Expert Profile:
Our Industries We Serve
EVMBOK
Our Core Values
Participating Aerospace & Defense Companies
DISCOVER
PDUs
Approach
EVMI FAQs
Shop
Cart
My account
News
News Feed
INFORMATION
WorldEVMDay®
EVMi® Leadership Academy
FederalevmMonth
TOP 10
Our Blog
Solutions
Job openings
EVMpedia
Resources
EXPERIENCE
Our Services
Health Crisis PM™
US Federal Government Approved
Notice About Changes on EVMP Certification on 1 January 2020*
Best Earned Value Management Systems (EVMS) Software – 2022
Affiliated Organizations
C-Suite Institute ((Executive & C-Suite Education Global Leader))
Defense Acquisition University (DAU)
Project Management Institute (PMI)
Northwind Group resiliently complete their EVMP certifications during COVID-19 Pandemic
Featured Alumni
Resiliency
*EVMI COVID-19 Guidelines and Announcements
RRRP Risk, Resilience & Recovery Professional™ (COVID19)
HealthCrisisPPM™ Health Crisis & Pandemic Project Manager™ (COVID19)
CRRRO Chief Risk, Resilience & Recovery Officer™ (COVID19)
Alum
1.855.400.3864
Toll Free
MON - FRI: 9.00 AM - 5.00 PM; SAT - SUN: CLOSED
STORE
Home
CPCP™ Certified Project Control Professional™ | $4,999 | 5 Days
CPCP_Certified_Project_Control_Professional_FACTSHEET_2021_Rev4
CPCP_Certified_Project_Control_Professional_FACTSHEET_2021_Rev4
Leave a Reply
Cancel reply
post a comment
Δ